IT Is Down. The Plant Is Still Running. Do You Shut It Off?

A Tabletop Tuesday demo: the OT tabletop, with IT, operations, and leadership in one scenario

OT Track: Technical + Executive IT, OT and Controls, Operations, Safety, Leadership Live Session: Half Day

Scenario: ransomware tears through corporate IT at 3 a.m. on a Sunday. The control room sees nothing. Work the first two injects as the response team, then vote with the leadership table on the decision that defines every OT incident.

Inject 1 of 2 Technical track T+00:00 | Sun 03:12
Decision clock15:00
Inject 1 | Detection

Ransomware is moving through corporate IT. The control room has no idea.

[03:12:44] ALERT EDR / corporate IT Hosts: FS-CORP-02, FS-CORP-04, ERP-APP-01 (+34) Detection: mass file rename (*.lockd), shadow copies deleted Parent: PsExec as svc-backup (domain admin) Spread: 37 IT hosts in 11 minutes [03:14:10] FIREWALL IT/OT DMZ ALLOW ERP-APP-01 -> HIST-DMZ-01 tcp/1433 (scheduled pull) ALLOW JUMP-VENDOR-01 -> OT-EWS-01 tcp/3389 (session open 6 days) OT alarms: none | Process: normal

A domain admin account is pushing ransomware across IT. OT shows no alarms and the process is running normally. But the IT/OT DMZ is still passing traffic, and a vendor jump host has an RDP session into the engineering workstation that has been open for six days. The night shift operator has not been told anything.

Facilitator note: This inject tests whether the team knows where the IT/OT boundary actually is, and whether anyone has pre-approved authority to cut it at 3 a.m. The clock starts now.
Your call, first 15 minutes

What does the on-call team do right now?

What strong teams doCut the conduits and call the control room. Isolation protects the process without stopping it, which is exactly what a pre-planned isolation procedure is for. Kill the six-day vendor session and preserve the DMZ hosts before anyone rebuilds them. Shutting down the process is not a call the on-call IT analyst makes at 3 a.m. It belongs to operations, with safety in the room. If nobody can cut the boundary without holding a meeting first, that is your first finding.

Why OT Incidents Need Their Own Tabletop

A standard IT tabletop asks how fast you can contain and recover. In an OT incident, the fastest containment move can be the most expensive business decision you make all year.

The process comes first

Safety and physical operations outrank evidence, speed, and convenience. Responders who are used to IT need to know what they are not allowed to touch.

Shutdown is a business decision

Stopping operations costs revenue, customers, and sometimes public trust. It needs a named owner and written criteria, not an analyst at 3 a.m.

Your vendors are inside the fence

Integrators and OEMs hold remote access paths that often nobody inventories. In many OT incidents, that path is how the attacker got in.

IT pain is not OT risk

When ERP, scheduling, and billing go down, the pressure to stop the plant is real. The room has to separate "we cannot run the business" from "we cannot trust the process."

One Scenario, Every Seat at the Table

The OT tabletop joins our two formats into one session. The technical team works the injects, then hands leadership the update they would actually receive. Plant leadership and safety vote alongside the executives.

OT Tabletop

IT, OT and controls engineering, operations, EHS, executives
  • Technical injects with a decision clock, then executive decision points with a room vote
  • Tests the IT/OT boundary, vendor access, and the keep-running decision
  • Plan updated live, with owners and dates

Technical Tabletop

SOC, IT ops, security engineering, platform teams
  • Injects are alerts, logs, and tool output
  • 90 minutes, 5 to 7 injects, 15-minute decision clock

Run the technical demo

Executive Tabletop

CEO, CFO, General Counsel, board or audit committee
  • Updates from the technical team and a room vote at each decision point
  • 60 to 75 minutes, 3 to 4 decision points

Run the executive demo

Run This With Your Plant and Leadership Team

We build the scenario around your process, your vendors, and your network boundaries. We facilitate, your team decides, and you leave with a findings memo and a plan that has already been changed.